Specific project team experience includes assisting Micron with several major building expansion projects. In 2001 the 17 acre Micron Mask Building located on Technology Way and in 2007 the 12 acres Photronix Production Facility located along Federal Way. Both building are locted adjacent to the Micron's Boise Technology Campus.

Project tasks included assisting in the pre-planning exercise and coordination with the City of Boise to develop a conceptual plan that was consistent with the client's needs, which could be supported by the local community and the City of Boise. Civil design included a rock excavation plan, sanitary sewer plan and profile, grading & drainage, parking lot,  sidewalks, stormwated detention/mitigation facility, stormwater pump station, vehicle circulation, on adn off-site water, Columbia Road improvements, and a bypass channel. Coordination with ACHD, United Water, DEQ, Idaho Power, Intermountain Gas, Boise City and other consultants.

(Project Experience by Scott Sherrow and\or Laren Bailey)

micronCampusInline.JPG

Project Experience


  • Pre-Planning
  • Civil Design:
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road Improvements
  • Construction Observation & Administration Services


Additional Micron Project Experience



  • Micron Mask
  • Photronix Facility
  • Technology Building 35 Shop
  • Technology Fab 4 Expansion
  • Technology North Parking, #3
  • Electronics Trailer Storage Lot
  • Technology SONET Loop
  • Technology River Water Pipeline