Gowen Warehouse


Boise, Idaho
The Van Auker Companies

PDF Download

The Gowen warehouse project is a 165,000 SF of warehouse space on 12 acres of land located along Gowen Road east of the City of Boise Regional Airport. The project site is located in an area of Boise with significant basalt lacated near the ground surface.

The project design team, working with the owner and the site's contractors, sited the building and developed a grading plan to minimize the impacts of the underlying rock formations and reduced overall construction costs.

The completion of the construction documents for the project included; site grading design, temporary erosion and sedimentation plans, drainage analysis, stormwater conveyance design, water and sewer design, Sanitary sewer lift station, on-site and off-site roadway design. Project included extensive underground utilities coordination and coordination with the City of Boise Staff.

gowenWarehouseInline.JPG

Project Experience


  • Pre-Planning
  • Civil Design:
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road improvements
  • Construction Observation & Administration Services

Micron Corporate Campus


Boise, Idaho
Micron Technology, Inc.

PDF Download

Specific project team experience includes assisting Micron with several major building expansion projects. In 2001 the 17 acre Micron Mask Building located on Technology Way and in 2007 the 12 acres Photronix Production Facility located along Federal Way. Both building are locted adjacent to the Micron's Boise Technology Campus.

Project tasks included assisting in the pre-planning exercise and coordination with the City of Boise to develop a conceptual plan that was consistent with the client's needs, which could be supported by the local community and the City of Boise. Civil design included a rock excavation plan, sanitary sewer plan and profile, grading & drainage, parking lot,  sidewalks, stormwated detention/mitigation facility, stormwater pump station, vehicle circulation, on adn off-site water, Columbia Road improvements, and a bypass channel. Coordination with ACHD, United Water, DEQ, Idaho Power, Intermountain Gas, Boise City and other consultants.

(Project Experience by Scott Sherrow and\or Laren Bailey)

micronCampusInline.JPG

Project Experience


  • Pre-Planning
  • Civil Design:
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road Improvements
  • Construction Observation & Administration Services


Additional Micron Project Experience



  • Micron Mask
  • Photronix Facility
  • Technology Building 35 Shop
  • Technology Fab 4 Expansion
  • Technology North Parking, #3
  • Electronics Trailer Storage Lot
  • Technology SONET Loop
  • Technology River Water Pipeline
  • Micron/Crucial Motherboard Expansion

Micron Mask Building


Boise, Idaho
Micron Technology, Inc.

PDF Download

In 2001, Scott Sherrow, project engineer/project principal, coordinated the site civil design for the 17 acre Micron Mask Building located on Technology Way adjacent to Micron's Boise Technology Campus. Project tasks included assisting in the pre-planning exercise and coordination with the City of Boise to develop a conceptual plan that was consistent with the client's needs, which could be supported by the local community and the City of Boise.

Civil design included a rock excavation plan, sanitary sewer plan and profile, grading & drainage, parking lot, sidewalks, stormwater detention/mitigation facility, stormwater pump station, vehicle circulation, on and off-site water, Columbia Road improvements, and a bypass channel. Coordination with the Ada County Highway District, United Water, DEQ, Idaho Power, Intermountain Gas, Boise City and other consultants.

micronMaskInline.JPG

Project challenges included the design of two full service loading docks with a grade separation of over 14 feet in less than 100 feet of separation horizontally. The solution involved the design of a 20 foot tall retaining wall and associated truck ramps. Due to an ever fluctuating chip market it was necessary for the client to have the project completed in an extremely short time frame. Our staff was able to facilitate an accelerated plan review process at the City of Boise that saved several months in the design process, saving the Client time and money.

(Project Experience by Scott Sherrow and\or Laren Bailey)
 

Project Experience


  • Pre-Planning
  • Civil Design:
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road Improvements
  • Construction Observation & Administration Services

Photronics Building


Boise, Idaho
Micron Technology, Inc.

PDF Download

In 2007, Photronics and Micron partnered in the design of the 12 acre Photronics Mask Building located on Federal Way adjacent to Micron's Boise Technology Campus. Project tasks included assisting in the pre-planning exercise and coordination with the City of Boise to develop a conceptual plan that was consistent with the client's needs, which could be supported by the local community and the City of Boise.

photronixInline.JPG

Civil design included a rock excavation plan, sanitary sewer plan and profile, grading & drainage, parking lot, sidewalks, stormwater detention/mitigation facility, stormwater pump station, vehicle circulation, on and off-site water, Federal Way Road improvements, and a bypass channel. Coordination with the Ada County Highway District, United Water, DEQ, Idaho Power, Intermountain Gas, Boise City and other consultants.

The Architectural design of this building was substantially similar to the Micron Mask building that was completed in 2001. Because of our staffs experience on the previous project they were selected to design the utility Infrastructure and parking facilities for the project.

Our staff was able to facilitate an accelerated plan review process at the City of Boise that saved several months in the design process, saving the Client time and money.

(Project Experience by Scott Sharrow and\or Laren Bailey)

Project Experience


  • Pre-Planning
  • Civil Design:
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road Improvements
  • Construction Observation & Administration Services

Safeway Distribution Center


Auburn, Washington
Safeway, Inc.

PDF Download

The Safeway Distribution Center: Specific project team experience includes assisting Safeway Inc. with site selection and design for its regional distribution center in Auburn, Washington. Scott Sherrow PE served as project principal and project manager in the site selection and site feasibility to locate and evaluate locations for the new regional Safeway Distribution Facility in Washington State.

After a site was selected the team performed a site feasibility analysis and had a lead role in the project entitlements for the redevelopment of this former Boeing facility. The project team provided the City of Auburn the necessary site and environmental and site information that allowed the City of make an informed decision on the project. This enabled the client to avoid the lengthy process of preparing an Environmental Impact Study. This saved Safeway significant time and money.

safewayInline.JPG

The Facility, 116 acres in size, included a 538,000 square feet dry goods warehouse and a 515,000 square foot refrigerated warehouse, a recycling center, trucking department, dispatch office, fuel station, truck repair shop and an administration center, 50 acres of concrete pavement, and a 300,000 cubic foot storm water detention/water quality pond.

(Project Experience by Scott Sherrow and\or Laren Bailey)

Project Experience


  • Pre- Planning/Site Selection
  • Site Feasibility Study
  • Expedited Project Permitting
  • Agency Coordination
  • Civil Design:
    • Dimensional Site Plan
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sewer Collection System
    • Off-Site Road Improvements

Industrial/Corporate Campuses


,

PDF Download

LEI staff has extensive experience planning, designing and coordinating industrial and corporate campus developments such as large scale office complexes, manufacturing facilities, and shipping and receiving centers.

industrialInline.JPG

LEI’s team has been a key player in many high profile industrial projects across the West including:

Micron Technology, Corporate Campus - Boise, Idaho
Microsoft World Headquarters, Redmond, Washington
Birchtree Industrial Park, Orem, Utah
Safeway Food Stores, Distribution Center - Auburn, Washington
Summit Industrial Park, Park City, Utah
Fed-Ex, Shipping and Receiving Center - Boise, Idaho
Eddie Bauer, Corporate Headquarters – Redmond, Washington
Burbidge Industrial Park, Linden, Utah
Sky Ranch, Business Center Caldwell, Idaho
Unigard Insurance, Business Park Bellevue, Washington
Gowen Warehouse, Boise, Idaho

(Project Experience by Scott Sherrow and\or Laren Bailey)

Project Experience


  • Conceptual Master Planning
  • Preliminary Plat
  • Public Hearing Presentation
  • Agency Coordination
  • Irrigation Facilities Design
  • Sewer master plan
  • Water master plan
  • Civil Design
    • Site Grading
    • Stormwater Management
    • Water Distribution Design
    • Sanitary Lift Station
    • Sewer Collection System
    • Off-Site Road improvements
  • Marketing Displays and Materials
  • Final Plat
  • Construction Observation & Administration Services

Elberta Industrial Park


Elberta-Utah County, Utah
Suburban Land Reserve

PDF Download

LEI, along with consultants from around the country, have been instrumental in the preparation of the Goshen Valley Specific Area Plan located in Utah County.  The area covered by this plan is approximately 65,000 acres extending 13 miles north of Elberta and 5 miles south, with an approximate width of four miles.  This area includes a large future industrial area as well as both residential and commercial development areas.  LEI has worked with Utah County's Commissioners, Planning Commission, and Staff throughout the implementation of this Specific Area Plan.  The preparation of the Planned Community Zone (P-C Zone), Community Structure Plan (CSP) and the Development Standards were also prepared in conjunction with this Area Plan.

Project Experience


  • Project Management
  • Civil Engineering
  • Government Processing
  • ALTA Surveys
  • County Coordination
  • General Plan Amendment